Inspection Status: Passed
Inspection History: COT - HCPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/18/2026 |
COT - HCPL - Plumbing Final |
|
Passed |
|
| 12/12/2025 |
COT - HCPL - Plumbing Final |
|
Re-inspection required |
Provide sterilization report. Provide 1" air gap at pipes from floor drain. Leak at water heater. Insulate hot line on water heater. Coat all exterior pipes on roof. (Ensure all disconnects are labeled). 12/12/2025 |
| 12/16/2025 |
COT - HCPL - Plumbing Final |
|
Re-inspection required |
12/16/25: All exterior plastic piping must be coated for UV protection, service receptacle required within 25' of Roof top equipment for service, all weather covers required to be intact and installed on HVAC equipment to protect breaker from weather, freezer condescending unit is frozen over, properly support all liquid tight at roof, all disconnect boxes must be properly labeled with metal tags, cap all unused emt pipes stubbing through roof, air gap required at 3-compartment sink, water sterilization required for TCO above level 1, Pima county health inspection required prior to issuance of TCO, exterior work at canopy required to be complete including work to roof drain, pending (fire,engineering,r.o.w,building) finals. |
| 12/18/2025 |
COT - HCPL - Plumbing Final |
|
Partial Pass |
12/18/24: OKAY FOR LEVEL 4 TCO( pending:12/16/25: All exterior plastic piping must be coated for UV protection, service receptacle required within 25' of Roof top equipment for service, cap all unused emt pipes stubbing through roof, water sterilization currently submitted pending review,Pima county health inspection required prior to issuance of TCO. |