Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Re-inspection required
Inspection History: COT - HCEL - Electrical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2025 |
COT - HCEL - Electrical Final |
|
Re-inspection required |
8-27-25: pending conditions, required corrections to include: wrapping of hot piping on water heater, RFI for HVAC & RFI for receptacle relocation in office area, adjusting all interior /exit doors to open at 5 pounds of pressure, missing junction box lid at electrical room above ceiling,firefoam any vertical /horizontal penetration where piping/conduits extend through to another space. Existing electrical panels not in use must be "gutted" to the possible unlawful use at a later date and must be clearly labeled "panel not in use." |
| 09/02/2025 |
COT - HCEL - Electrical Final |
|
Passed |
9-2-25: electrical final approved. |