Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2025 | COT - HCBU - Building Final | Re-inspection required | 8-27-25: pending conditions, required corrections to include: wrapping of hot piping on water heater, RFI for HVAC , adjust all interior /exit doors to open at 5 pounds of pressure,firefoam any vertical /horizontal penetration where piping/conduits extend through to another space. Existing electrical panels not in use must be "gutted" to the possible unlawful use at a later date and must be clearly labeled "panel not in use." | |
| 09/02/2025 | COT - HCBU - Building Final | Re-inspection required | 9-2-25: secure mc cable & fire foam penetration above electrical HV1 panel and at any horizontal penetration where piping/conduits extend through to another space. Existing electrical panels not in use must be clearly labeled "panel not in use" and add blanks to open knock outs at panels not being used. Pending electrical & HVAC RFI. | |
| 09/05/2025 | COT - HCBU - Building Final | Partial Pass | 9-5-25: partial pass pending Electrical & HVAC RFI Okay for Level 4 TCO. |
|
| 09/09/2025 | COT - HCBU - Building Final | Passed | 9-9-25: building final approved. All conditions have been met. |