Inspection Status: Partial Pass

Inspection History: COT - HCME - Mechanical Final 

Date Description Inspector Results Comments
COT - HCME - Mechanical Final  Partial Pass 4/25/24: Water heater not installed per plans, Expansion tank at water heater obstructs the shutoff valve at water heater, Urinal at men's bathroom not installed, exhaust termination at roof not complete, refrigerant lines at roof need proper mechanical straps to hold electrical whip to refrigerant lines (zip ties are not allowed), rain caps required at refrigerant jacks at roof they must also be sealed, UV protect exterior piping, Mechanical not complete on roof,
4/26/24: level 3 TCO
COT - HCME - Mechanical Final  Re-inspection required 4/25/24: Water heater not installed per plans, Expansion tank at water heater obstructs the shutoff valve at water heater, Urinal at men's bathroom not installed, exhaust termination at roof not complete, refrigerant lines at roof need proper mechanical straps to hold electrical whip to refrigerant lines (zip ties are not allowed), rain caps required at refrigerant jacks at roof they must also be sealed, UV protect exterior piping, Mechanical not complete on roof,
04/30/2024 COT - HCME - Mechanical Final  Passed