Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - HCME - Mechanical Final | Partial Pass | 4/25/24: Water heater not installed per plans, Expansion tank at water heater obstructs the shutoff valve at water heater, Urinal at men's bathroom not installed, exhaust termination at roof not complete, refrigerant lines at roof need proper mechanical straps to hold electrical whip to refrigerant lines (zip ties are not allowed), rain caps required at refrigerant jacks at roof they must also be sealed, UV protect exterior piping, Mechanical not complete on roof, 4/26/24: level 3 TCO |
||
| COT - HCME - Mechanical Final | Re-inspection required | 4/25/24: Water heater not installed per plans, Expansion tank at water heater obstructs the shutoff valve at water heater, Urinal at men's bathroom not installed, exhaust termination at roof not complete, refrigerant lines at roof need proper mechanical straps to hold electrical whip to refrigerant lines (zip ties are not allowed), rain caps required at refrigerant jacks at roof they must also be sealed, UV protect exterior piping, Mechanical not complete on roof, | ||
| 04/30/2024 | COT - HCME - Mechanical Final | Passed |