Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2023 |
ENGR Engineering Final
|
|
Partial Pass |
okay for TCO level 4 per DRoberts |
| 08/22/2023 |
ENGR Engineering Final
|
|
Partial Pass |
okay for TCO level 4 per DRoberts |
| 08/24/2023 |
ENGR Engineering Final
|
|
Partial Pass |
solid waste container still present, scheduled removal august 25 am, per job supervisor Josh with Sundt |
| 08/31/2023 |
ENGR Engineering Final
|
|
Passed |
|