Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2026 | ENGR Engineering Final | Not Ready | Fence not built. Asphalt not patched where cut for conduit was made. Reschedule when project is complete. | |
| 03/27/2026 | ENGR Engineering Final | Passed |