Inspection Status: Partial Pass
Inspection History: COT - HCPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 10/02/2025 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Pour area #1; waste and vent lines (2” - 6”) at area East of elevator shaft. Ok to cover progress areas. |
| 10/17/2025 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Main sewer lines at 4” and connecting laterals at 3” lines from Lobby West to approximately room #127: under hydro test. Ok to cover progress areas. |
| 10/24/2025 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Level #1, Areas #1, 2, 3 (West position of structure) at 4” main sewer line with 3” lateral lines. Ok to cover progress areas. |
| 10/28/2025 |
COT - HCPL - Rough Soil |
|
Partial Pass |
10/28/25: 15' of 4" copper for main water underground at west side of project. Ok to proceed with backfill. |