Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | BULD - Electrical Clearance | Passed | Partial for the new 500kw Generator #1 connected to existing panel #G - AG Clearance to TEP is required Pending the installation of Generator #2 |
|
| 12/09/2024 | BULD - Electrical Clearance | Passed | Approved (2) new 500kw Generator #1 and #2, connected to existing panel #G - AG Clearance to TEP is required for unit #2 Pending final - NR |