Inspection Status: Partial Pass
Inspection History: COT - HCPL - Sewer
| Date |
Description |
Inspector |
Results |
Comments |
| 03/17/2026 |
COT - HCPL - Sewer |
|
Partial Pass |
Partial pass. 4" main drain line tied into HCS (north end). Running into shell building and stubbed out of south end. Total of 2 FCO. Okay to backfill all progress areas. Shading required. 3/17/2026 |
| 03/25/2026 |
COT - HCPL - Sewer |
|
Partial Pass |
3-25-26: underground plumbing for building 3's grease line verified under test & per plans- P1.0. Okay to backfill progress areas using shading materials. |
| 04/30/2026 |
COT - HCPL - Sewer |
|
Re-inspection required |
4-30-26: grease interceptor verified under test but missing tracer wire. |
| 05/04/2026 |
COT - HCPL - Sewer |
|
Not Ready |
5-4-26: main water line under test at 100 psi but is missing the tracer wire. Reschedule when ready. |
| 05/05/2026 |
COT - HCPL - Sewer |
|
Partial Pass |
5-5-26: verifed 2" copper main water line stub-up at north side of building under test at 100psi. Also, verified tracer wire at grease interceptor. |
| 05/14/2026 |
COT - HCPL - Sewer |
|
Partial Pass |
5-14-26: previously inspected. |