Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/01/2026 |
ENGR Engineering Final
|
|
Not Ready |
Regarding curb ramp at south side of the PAAL at south end of crosswalk and site. This ramp should not be poured as is- Due to the existing landing at top being over 2% cross slope and the type 1 curb and crosswalk at bottom also also being over 2% cross slope. The asphalt PAAL where this crosswalk is proposed leading to the EV chargers exceeds 2% cross slope. In addition the landing at the bottom of the curb ramp on the north side of PAAL exceeds 2% cross slope. Engineer of record should design a solution to make these conditions comply. |