Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: COT - LCPL - Sewer
| Date |
Description |
Inspector |
Results |
Comments |
| 03/03/2026 |
COT - LCPL - Sewer |
|
Partial Pass |
3/3/26: Partial pass for rough soil at slab (6" sleeve installed on 4" PVC for protection under exterior footing). Approved for backfill. 1-way clean out and BWV installed and approved. Pending cleanout after BWV and continuation of sewer line. |
| 06/25/2026 |
COT - LCPL - Sewer |
|
Passed |
6-25-26: verified trench depth at 2' on a 4" SDR35 PVC sewer pipe with tracer wire under test. Okay to backfill approximately 125' of trench using shading materials. |