Inspection Status: Partial Pass
Inspection History: COT - LCEL - Grounding/BondingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 06/03/2026 |
COT - LCEL - Grounding/BondingĀ |
|
Partial Pass |
6/3/26: #3/0 ground from electrical system grd bus to test stand pad#1 per approved plans, #3/0 ground from SWGR to test stand pad #2 per approved plans ok to proceed with backfill. |
| 07/24/2026 |
COT - LCEL - Grounding/BondingĀ |
|
Re-inspection required |
7-24-26: excavation/ reinforcement on 5 light pole cages verified per plans. Remove all loose fill from bottom of trenches, install grounds, and we need to verify anchor bolts. |