Permit: TC-COM-0925-01611

Parcel: 14048003A


Addresses:

8650 S ALVERNON WY

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
06/08/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 6/8/26: GL 1 and 3 ready for concrete placement ( submit revised set of plans on DP to accurately reflect 5" Concrete over 4" ABC)
06/29/2026 COT - LCBU - Excavation/Rebar/Zoning  Re-inspection required 6-29-26: add blocks/chairs along edges/ends & remove all loose fill (throughout) from underneath reinforcement at each equipment pad. Reschedule inspection when corrections are made.
07/01/2026 COT - LCBU - Excavation/Rebar/Zoning  Re-inspection required 7-1-26: called POC at 723am and left message advising that I would be on site in the next 5 minutes. Arrived on site at 727am and waited for an escort at Gate 81A. I waited until 737am and left. Reschedule inspection when ready.
Note: another failed inspection will result with a re-inspection fee.
07/30/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 7-30-26: excavation/reinforcement & bonding on 5 light pole cages approved. Okay for concrete placement.
09/01/2026 COT - LCBU - Excavation/Rebar/Zoning  Passed