Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/2026 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
1-6-26: verified Schedule 40 electrical conduits on a total of 3 pay stations. Conduits range from 3/4" to 1" for low voltage and power. 6-1" conduits total for each island and low voltage 3/4" for gates and data. Okay to continue with construction at progress areas. |
| 02/11/2026 |
COT - HCEL - Electrical Underground |
|
Passed |
2-11-26: approved. |
| 09/10/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
9-10-25: verified in excess of 30 primary & secondary Schedule 40 electrical conduits ranging from 1-4" in size throughout site. These conduits are intended for SES, panels, motor controllers. An actual count of conduits will be taken prior concrete placement. Okay to continue with construction at progress areas. |