Permit: TC-COM-0825-01536

Parcel: 132130530


Addresses:

755 E 44TH ST

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
01/14/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 1-14-26: inspected reinforcement on footings for columns intended to support mezzanine and reinforcement for pour back on a section of slab on grade that was removed to verify footing depth for a possible installation of a new beam. RFI for pour back/new column footers are to be submitted to the city for review and approval. Okay for concrete placement at own risk. Any additional revisions must be submitted to the city prior to any inspections being scheduled.
02/09/2026 COT - LCBU - Excavation/Rebar/Zoning  Passed
11/18/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 11-18-25: reinforcement at room 101 for footers/pourbqck verified per S2.0 detail's 102& 103. Okay for concrete placement at progress areas.
11/20/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 11-20-25: reinforcement/excavation on interior wood post footing at south end of room 101 verified per S1.0 detail 102. Okay for concrete placement.
11/26/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Footings in locker room, #4 rebar dowels to existing slab. Underground plumbing in restroom. Ok to place concrete in progress areas.