Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2025 | COT - HCBU - Preslab | Partial Pass | 1/8/25: reinforcement at loading dock footing per plan (per detail S3.2/315, S3.3/19, S3.3/25) 1/16/25: reinforcement per plan at (19) column footings GL A-D.2/1.2-7. Ok for concrete placement. 1/17/24: reinforcement per plan at slab column footings GL A-D.5/1-7 ok for concrete placement |
|
| 01/21/2025 | COT - HCBU - Preslab | Partial Pass | 1/8/25: reinforcement at loading dock footing per plan (per detail S3.2/315, S3.3/19, S3.3/25) 1/16/25: reinforcement per plan at (19) column footings GL A-D.2/1.2-7. Ok for concrete placement. 1/17/24: reinforcement per plan at slab column footings GL A-D.5/1-7 ok for concrete placement 1/21/25: reinforcement per plan at (16) column footings GL A-D.3/8-12 |
|
| 02/24/2025 | COT - HCBU - Preslab | Partial Pass | 2-24-25, reinforcement per plan-okay to pour footing & pad at southwest end. | |
| 12/16/2025 | COT - HCBU - Preslab | Re-inspection required | 12-16-25: As per the approved plans page-S1.1 keynote #9 states that a vapor barrier for slab at office area is required. As per our conversation, written documentation from the architect/engineer's is required showing that the vapor barrier is not required. This documentation must be submitted to the city for review/approval. |