Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 04/15/2026 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
4-15-26: verified trench depth at 2' for 2-4" Schedule 40 conduits for CT cabinet. Okay to backfill approximately 40' of trench using shading materials. |
| 11/18/2025 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
11-18-25: verified a 3" Schedule 40 electrical conduit to feed building. Okay to backfill approximately 30' of trench and continue with construction at progress areas. |