Inspection Status: Not Ready
Inspection History: COT - HCPL - Plumbing Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 01/12/2026 |
COT - HCPL - Plumbing Progress |
|
Not Ready |
Inspection was for underground plumbing at wood shop. Not under test. Provide 14 gauge green tracer wire to line outside of the slab. 1/12/2025 |
| 01/13/2026 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
Plumbing underground in Southwest restroom area. Ok to cover progress area. |
| 05/13/2026 |
COT - HCPL - Plumbing Progress |
|
Re-inspection required |
5-13-26: DWV not under test & provide supports for DWV/PCV, add Boca plates where piping is installed closer than 1 1/4" from stud edge. |
| 06/08/2026 |
COT - HCPL - Plumbing Progress |
|
Re-inspection required |
6-8-26: DWV not under test, add straps to DWV at 4' intervals, secure pex/ condensation lines at marked areas, and extend vents through decking at roof. |
| 11/25/2025 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
Plumbing underground: waste lines (2” - 4”) at South side of structure under hydro test, approximately 35 feet from structure. Ok to cover progress areas. |