Permit: TC-COM-0823-01920

Parcel: 136087620


Addresses:

9520 E 22ND ST

Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
02/19/2025 BULD - Electrical Clearance Re-inspection required Failed - 400A 3-phase not per approved plan (600A) also wrong grounding conductor size installed, min #2/0 cu required
04/24/2025 BULD - Electrical Clearance Passed Approved new 600A service panel and EV Charger installation - ECO Clearance to TEP is required
09/19/2024 BULD - Electrical Clearance Canceled NR, 3-phase conductors not installed to transformer - cancelled by contractor