Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 02/19/2025 |
BULD - Electrical Clearance |
|
Re-inspection required |
Failed - 400A 3-phase not per approved plan (600A) also wrong grounding conductor size installed, min #2/0 cu required |
| 04/24/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved new 600A service panel and EV Charger installation - ECO Clearance to TEP is required |
| 09/19/2024 |
BULD - Electrical Clearance |
|
Canceled |
NR, 3-phase conductors not installed to transformer - cancelled by contractor |