Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
01/22/2026 BULD - Electrical Clearance Re-inspection required 1/22/26: Revision required for changes in conductor size at main panel and location of sub-panel must be appropriately identified on plan set, bond bushings required at raceway, conductors at panel must be protected from abrasion at raceway, EMT must be appropriately secured throughout,
06/10/2026 BULD - Electrical Clearance Passed 06/10/2026
Clearance TEP INCR for panel replacement.
12/24/2025 BULD - Electrical Clearance Not Ready