Inspection Status: Passed
Inspection History: COT - HCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 02/10/2026 |
COT - HCBU - Framing |
|
Passed |
2-10-26: framing/exterior/interior clips/sheathing approved. |
| 08/01/2025 |
COT - HCBU - Framing |
|
Partial Pass |
Partial pass. Building 1 interior framing approved. Okay to proceed progress areas. 8/1/2025 |
| 11/07/2025 |
COT - HCBU - Framing |
|
Partial Pass |
11-7-25: Interior metal framing for Building 2, room's 202-206 approved. A 3party inspector verified interior steel framing and exterior framing was installed by a metal framing. Verify that there are no additional framing requirements for Building 1. Okay to continue with construction at Building 2 progress areas. |