Permit: TC-COM-0724-01311

Parcel: 141185450


Addresses:

9537 E OLD VAIL RD

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
01/07/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Footing is properly dug and cleaned out. Rebar reinforcement is in place per plan details along west side of property for retaining wall. Okay to pour concrete footings.
1/7/24: footing on south east and east of project site for retaining wall per plan. Ok to proceed
03/14/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 3-14-25, reinforcement for Office-Building 1, details 105, 107, and 111 verified as per plans. Okay to pour concrete.
05/09/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Building 2 warehouse. Partial pass hair pins have been cut and will be over lapped. Plans call for full length. Total of 21 pier footings. Okay for concrete placement at own risk. 5/9/2025
05/14/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Footing is properly dug and cleaned out. Rebar reinforcement is in place per plan details along west side of property for retaining wall. Okay to pour concrete footings.
1/7/24: footing on south east and east of project for retaining wall per plan. Ok to proceed

3-14-25, reinforcement for Office-Building 1, details 105, 107, and 111 verified as per plans. Okay to pour concrete.

Building 2 warehouse. Partial pass hair pins have been cut and will be over lapped. Plans call for full length. Total of 21 pier footings. Okay for concrete placement at own risk. 5/9/2025
5/14/25: building 2 warehouse total (21) pier footings reinforced per plans, hair pins have been replaced with continuous full length.
07/14/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 7-14-25: excavation/reinforcement on 9 warehouse footings/columns verified per plans. Okay
07/22/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 7-22-25: total of 6 canopy footers verified per Detail's 109 & 110. Okay to pour.
08/26/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 8-26-25: reinforcement on warehouse footings/foundations verified per details . Okay for concrete placement at progress areas
09/26/2025 COT - HCBU - Excavation/Rebar/Zoning  Passed 9-26-25: reinforcement for Building 1 cover slab on grade verified per plans-okay for concrete placement at progress areas.
11/25/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Footing is properly dug and cleaned out. Rebar reinforcement is in place per plan details along west side of property for retaining wall. Okay to pour concrete footings.