Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2026 | ENGR Engineering Final | Not Ready | Striping required, Water sterilization report required. Address step at truncated domes on SE Accessible parking. |