Inspection Status: Passed
Inspection History: COT - LCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 10/15/2026 |
COT - LCEL - Electrical Underground |
|
Passed |
10/15/2026 X2 3” conduit at new meter location. Ran to pole box location. Same x2 3” ran to new disconnect panel location. X4 4” from disconnect to ATS (automatic transfer switch) x4 3” from generator to ATS. X3 1 1/2” for low voltage. From generator to ATS. X1 1” for starter wire. From generator to ATS. X4 3” from transfer switch to new transformer location. X3 4” from new transformer location to directly into panel. X4 4” for alarm wire from gutter box on south end to existing shelter stubbed up on east end. All schedule 40 conduit. Over drive way 48” depth. Conduit east of fencing at 36” depth. Okay to backfill all progress areas. Shading material required. Ensure caution tape is in place after first lift of compaction. |