Inspection Status: Not Ready
Inspection History: COT - HCBU - Firewall/Fire Barrier/Firestop
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Not Ready | ||
| 10/13/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 10/13/2026 Level 14-9 electrical room 2 layers of 5/8” type x approved. (Verify level 10). Electrical rooms 8-3 1st layer only in place. (Verify level 7,5,4,3) Okay to proceed progress areas. | |
| 10/14/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Not Ready | ||
| 10/19/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Not Ready | ||
| 10/20/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 10/20/26: fire wall at electrical room at Level 2-4 approved per UL U411. Ok to proceed with taping. Please ensure all rooms are inspected prior to tape/mud. | |
| 10/21/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 10/21/26: First layer gypsum board approved in bathroom demising walls in rooms (1213/1212,1208/1209,1206 SE Wall,1204/1205,1203/1202,1221/1222 (more screws),1220/1221). Shaft walls 1st layer rooms (920/921,913/912,910/911,909/908). | |
| 10/28/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 10/28/26: floor 10 shaft approved 2nd layer, firewall on 12th floor back of bathroom 2nd layer approved in units 1201,1205,1206,1211,1212,1216,1218 | |
| 11/02/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 11/2/2026 Partial pass. 14th floor 1/22 demising walls. 1405,1406,1408/1409. 1410/1411 not ready. 1412, 1415/1416 more screws. 1418/1417 more screws. 1420/1421. Approved. Rc channel in place 14th floor corridor walls 1A4 (unit side) approved. Okay to proceed with progress areas. |
|
| 11/05/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 11/6/2026 Partial pass. L7-L2 electrical room 2nd layer screw approved. Okay to proceed with progress areas. | |
| COT - HCBU - Firewall/Fire Barrier/Firestop | Scheduled |