Inspection Status: Re-inspection required
Inspection History: COT - HCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 04/01/2026 |
COT - HCPL - Plumbing Intermediate |
|
Re-inspection required |
4-1-26: add supports to DWV at 4' intervals, fire foam all penetrations at top plates and where DWV penetrates exterior walls, add supports to horizontal copper lines at 6' maximum, copper lines 3/4" and larger must be insulated with R3 insulation, add Boca plates to domestic lines and DWV where closer than 1 1/4" from edge of studs. |
| 07/02/2026 |
COT - HCPL - Plumbing Intermediate |
|
Passed |
7-2-26: plumbing intermediates approved. |