Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/08/2026 |
ENGR Engineering Final
|
|
Partial Pass |
Site work is finished between the building and the parking lot and drive through. Contractor needs a little more time to finish on other side of drive-through and parking lot. Keep all potentially dangerous equipment and or construction materials away from public behind fencing. Keep public and business employees separated from construction activities. Correct address numbers need to be on building. These need to be elevated facing Campbell. Contingent on these conditions being met Okay to apply for level two TCO. |
| 07/15/2026 |
ENGR Engineering Final
|
|
Passed |
|