Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - LCPL - Plumbing Intermediate 

Date Description Inspector Results Comments
09/09/2025 COT - LCPL - Plumbing Intermediate  Re-inspection required Provide isolators at abs pipes running through metal framing. Secure abs running horizontal at every 4'. Add bracing midway at vent lines. DWV not in test in certain areas. Pex has been damaged in bathroom area. Secure pex lines throughout. Add backing for grab bars and shower chair. Provide a minimum of 18" of copper before transitioning to pex. 9/9/2025
09/10/2025 COT - LCPL - Plumbing Intermediate  Passed