Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2026 | COT - HCEL - Electrical Final | Not Ready | ||
| 10/02/2026 | COT - HCEL - Electrical Final | Partial Pass | ||
| 10/07/2026 | COT - HCEL - Electrical Final | Partial Pass | ||
| 10/08/2026 | COT - HCEL - Electrical Final | Partial Pass | ||
| 10/09/2026 | COT - HCEL - Electrical Final | Not Ready | ||
| 10/14/2026 | COT - HCEL - Electrical Final | Partial Pass | 10/14/26: Okay to apply for level 4 TCO (Floor 15) - pending Fire and Water Sterilization Report. | |
| 10/26/2026 | COT - HCEL - Electrical Final | Partial Pass | 10/26/2026 Partial pass. 14th floor Units 1403, 1404, 1405, 1406 (pending vertical grab bar in roll in shower), 1407, 1408, 1409, 1411 (pending vertical grab bar in roll in shower. Flush valve shall be on the open end). All other units approved. | |
| 10/27/2026 | COT - HCEL - Electrical Final | Partial Pass | ||
| 11/02/2026 | COT - HCEL - Electrical Final | Partial Pass | 11/2/2026 Partial pass. 1419,1418,1416,1415, corrections were made. 1420,1421,1422,1423,1424,1425,1426,1414 units approved. | |
| 11/04/2026 | COT - HCEL - Electrical Final | Re-inspection required | 11/4/26: 14th floor corridor + electrical/storage rooms final walk: Existing Electrical room - 1. Identify Romex line in existing panel 2. Mark existing electrical panel schedule West mechanical room - 1. Clamps on unistrut above fan coil 2. HVAC refrigerant line supports 3. Conduit supports 4. Verify and label breaker for disconnect 5. Tie in overflow switch on fan coil IDF room - 1. Supports on conduits within 3' 2. Remove low voltage from fire sprinkler pipe Elevator lobby Electrical - 1. Mc clamps 2. Mark electrical panel 3. Clamps off of light Janitors closet - 1. Clamp temporary water lines East Main Electrical room - 1. MC clamps 2. Verify disconnect 3. Remove unused conduit East Existing Electrical room - 1. Replace knockouts on box 2. Relabel panel schedule |
|
| 11/05/2026 | COT - HCEL - Electrical Final | Partial Pass | ||
| 11/10/2026 | COT - HCEL - Electrical Final | Not Ready | ||
| 11/13/2026 | COT - HCEL - Electrical Final | Partial Pass | ||
| 11/17/2026 | COT - HCEL - Electrical Final | Partial Pass | ||
| 11/20/2026 | COT - HCEL - Electrical Final | Partial Pass | Common areas and corridors 16th floor approved. 11/20/2026 |