Parcel: 12213221B


Addresses:

3966 E PIMA ST


Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-0624-01060

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/06/2025 ENGR Engineering Final Partial Pass 8/6/26
Pictures have been seen of work on footer and reinforcement and dimensions of footer are correct…
Okay to grout reinforced cells. Vibrate all grout. Cut in vent blocks for Final closeout. Schedule us for final when complete.
08/11/2025 ENGR Engineering Final Partial Pass Wall reinforcement is in place. Drainage blocks have been installed at finish grade. Okay to grout wall, will need to vibrate. Call in inspection to see finished conditions.
08/14/2025 ENGR Engineering Final Passed Wall construction and backfill are complete per plans.