Inspection History Details
Inspection Status: Re-inspection required (with fee)
Inspection History: COT - LCPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2026 | COT - LCPL - Plumbing Final | Re-inspection required (with fee) | 5-8-26: Lockout caps missing at all 3 west ac units Update panel schedule to match site Reroute condensation line Secure mini split to slab |
|
| 06/02/2026 | COT - LCPL - Plumbing Final | Passed | 6-2-26: plumbing final approved. |