Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
02/06/2026 BULD - Electrical Clearance Partial Pass 2-6-26: verified trench depth over 40" on a 4" PVC conduit for the fiber lines between the new building and an existing pull box near the building. Okay to backfill approximately 100' of open trench using shading materials.
02/09/2026 BULD - Electrical Clearance Not Ready Contractor cancelled, will reschedule for 10 February
02/11/2026 BULD - Electrical Clearance Canceled 2-11-26: canceled by contractor.
02/18/2026 BULD - Electrical Clearance Partial Pass 2-18-26: verified trench depth with tracer wire on approximately 175' of 4" PVC conduit to the pull box for fiber lines. Okay to backfill progress areas.
05/08/2026 BULD - Electrical Clearance Not Applicable 5-8-26: not applicable