Inspection Status: Partial Pass

Inspection History: COT - LCEL - Electrical Underground 

Date Description Inspector Results Comments
01/05/2026 COT - LCEL - Electrical Underground  Partial Pass 1-5-26: verified schedule 40 electrical conduits for panels and stub outs of pad at the east/west sides of site. Conduits range from 3/4" to 2 1/4"- okay to backfill progress areas.
01/13/2026 COT - LCEL - Electrical Underground  Passed Exterior conduits 1 1/4” and 1 1/2”. Ok to cover progress areas
12/18/2025 COT - LCEL - Electrical Underground  Partial Pass 12-18-25: verified conduit from gear to transformer in electrical room, conduit to exterior transformer, conduit for fiber and conduits to transformer/panels T2 & T3. All conduits are Schedule 40 and range from 1 1/4"-2 1/2"-Okay to backfill progress areas.