Inspection Status: Partial Pass
Inspection History: COT - HCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 09/15/2025 |
COT - HCBU - Framing |
|
Partial Pass |
9-15-25: mezzanine inspection-add shot pins to track at 12" o.c. Or 1/2" anchor bolts 4' o.c.. Also, provide a lift to verify screws at blocking & required clips at ledger per S3.0 Details 202. |
| 09/17/2025 |
COT - HCBU - Framing |
|
Partial Pass |
9-17-25: Partial pass on mezzanine framing. Shot pins & hangers verified per plans-construction is continuous and will verify H25's & A34's once remaining I-joists are in place. |
| 09/29/2025 |
COT - HCBU - Framing |
|
Partial Pass |
9-29-25: framing at mezzanine verified per plan-kickers at 4' o.c. to be verified at plywood is installed. Okay to drywall progress areas. |
| 10/06/2025 |
COT - HCBU - Framing |
|
Partial Pass |
10-6-25: framing at mezzanine approved. For any drywall -schedule a nailing inspection prior to tape & texture. |
| 12/04/2025 |
COT - HCBU - Framing |
|
Passed |
12-4-25: framing at mezzanine approved. |