Inspection History Details
Inspection Status: Partial Pass
Inspection History: LCBU - Preslab and Floodplain Inspection
Permit Number - TC-COM-0524-00906
Inspection Description - LCBU - Preslab and Floodplain Inspection
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2025 | LCBU - Preslab and Floodplain Inspection | Partial Pass | 4-22-25, Ufer, excavation/reinforcement for building's footing verified per approved plans-okay to pour footing. Note: floodplain certification to be submitted as part of pending conditions. |
|
| 04/29/2025 | LCBU - Preslab and Floodplain Inspection | Partial Pass | 4/29/25: Reinforcement per plan at 8" and 6" Stem-wall. Ok to proceed with concrete placement. | |
| 05/07/2025 | LCBU - Preslab and Floodplain Inspection | Not Ready | ||
| 05/14/2025 | LCBU - Preslab and Floodplain Inspection | Partial Pass | 5-14-25, verified that vapor in place together with reinforcement per plans. Per contractor, a civil engineer verified elevation to one-hundredth of an inch. However, their 3rd party (Meridian) will inspect after pour and complete the rest of the required paperwork. Okay to pour at own risk pending floodplain certification. Note: submit 3rd party and floodplain reports as soon as possible as it's required prior to building final. |
|
| 05/30/2025 | LCBU - Preslab and Floodplain Inspection | Partial Pass | 5-30-25: reinforcement on CMU wall/gridline D at 20'-okay to grout 5th lift. |