Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-0524-00902

Parcel: 136130060

Inspection Status: Re-inspection required

Inspection History: COT - HCBU - Building Final 

Date Description Inspector Results Comments
10/14/2026 COT - HCBU - Building Final  Re-inspection required 10/14/26: Heat-kit has to be marked on label if installed to verify proper fuses. (Only walked 1st floor), ADA requirements at break room (receptacles must be surface mounted to meet reach range), ada signage required at bathrooms, lobby area counter space for ADA required. (1st floor walked only)
10/19/2026 COT - HCBU - Building Final  Partial Pass Level Three for Ground level.
10/21/2026 COT - HCBU - Building Final  Partial Pass 10.22.26-2nd floor walked; okay for level 3 TCO please block off elevators until certified.