Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2026 | COT - HCME - Mechanical Final | Re-inspection required | 8.14.26 1. Need duct mastic throughout 2. In complete plumbing for condensate 3. Incomplete wiring for Air handler and condensers. |
|
| 10/14/2026 | COT - HCME - Mechanical Final | Re-inspection required | 10/14/26: Heat-kit has to be marked on label if installed to verify proper fuses. (Only walked 1st floor) |