Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 02/06/2026 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
2-6-26: advised contractor to schedule drain system under his development plan/civil. |
| 03/09/2026 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
3-9-26: excavation/reinforcement on 3 spread footings for canopy verified per plans with 8-#5's top & bottom. Okay for concrete placement at progress areas. |
| 04/21/2026 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
4-21-26: per NEC, Table 300.5 minimal trench depth (cover) for a 1" Schedule 40 electrical conduit is 18" in residential, commercial, or industrial applications from top of conduit to finished grade. Reschedule this inspection when ready. Okay for concrete placement at light pole cage east of the trash enclosure. |
| 06/08/2026 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Passed |
|