Inspection Status: Re-inspection required
Inspection History: COT - HCBU - TCO
| Date |
Description |
Inspector |
Results |
Comments |
| 09/22/2026 |
COT - HCBU - TCO |
|
Re-inspection required |
9/22/26: Water sterilization required for (Red panda exhibit,Siamang and Tiger Night House), site plan + egress route required showing what areas are requested for Level 2 TCO (ensure face plan is included), blank all open j-boxes and ensure all open (receptacles) have been made up and have appropriate Heavy duty in use cover, fire + engineering final required for approval of TCO. Ensure all open trenches are backfilled and all electrical equipment is completed. Please re-call once all work is ready for TCO walk through. |
| 09/28/2026 |
COT - HCBU - TCO |
|
Partial Pass |
9/26/26:Okay to apply for addition of Tiger, Red Panda and Siamang buildings to level 2 TCO |
| 10/02/2026 |
COT - HCBU - TCO |
|
Partial Pass |
10/2/26: Okay to apply for addition of Pheasantry & Fishing Cat building to level 2 TCO |
| 10/09/2026 |
COT - HCBU - TCO |
|
Partial Pass |
10/8/26: OAKY TO APPLY FOR ADDITION OF OTTER EXHIBIT TO LEVEL 2 TCO. |