Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Underground
Permit Number - TC-COM-0523-01267
Inspection Description - COT - HCEL - Electrical Underground
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2024 | COT - HCEL - Electrical Underground | Not Ready | 10/6/23 - Partial for underground electrical conduit from the in ground junction box to across the concrete area by the modular buildings, okay to backfill progress areas 4/25/24: not ready |
|
04/26/2024 | COT - HCEL - Electrical Underground | Partial Pass | 10/6/23 - Partial for underground electrical conduit from the in ground junction box to across the concrete area by the modular buildings, okay to backfill progress areas 4/25/24: not ready 4/26/24: partial for underground electrical (2) 4" secondaries from transformer to equipment ok to backfill. (2) 1" for lighting ok to backfill. |
|
05/06/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
07/11/2024 | COT - HCEL - Electrical Underground | Partial Pass | 10/6/23 - Partial for underground electrical conduit from the in ground junction box to across the concrete area by the modular buildings, okay to backfill progress areas 4/25/24: not ready 4/26/24: partial for underground electrical (2) 4" secondaries from transformer to equipment ok to backfill. (2) 1" for lighting ok to backfill. 5/6/24 partial for 3 sub panel conduits from 2 trailers to disconnects, ok to cover and partial from the disconnect to approximately 40' going to the future 3rd trailer, ok to cover |
|
08/06/2024 | COT - HCEL - Electrical Underground | Passed | ||
10/06/2023 | COT - HCEL - Electrical Underground | Partial Pass | Partial for underground electrical conduit from the in ground junction box to across the concrete area by the modular buildings, okay to backfill progress areas |