Inspection Status: Partial Pass
Inspection History: COT - HCBU - Masonry Pregrout
| Date |
Description |
Inspector |
Results |
Comments |
| 08/19/2026 |
COT - HCBU - Masonry Pregrout |
|
Partial Pass |
8-19-26: reinforcement at elevator hoist way verified per plans- okay to grout 1st. lift at 4' 8". |
| 08/21/2026 |
COT - HCBU - Masonry Pregrout |
|
Partial Pass |
8-21-26: reinforcement at elevator hoist way verified per plans. Okay to grout 2nd lift at 9' 4". |
| 08/24/2026 |
COT - HCBU - Masonry Pregrout |
|
Partial Pass |
8/24/2026 Building #3. 3rd lift at mechanical room/elevator shaft. 9'4-14'. Approved per 3rd party report. |
|
COT - HCBU - Masonry Pregrout |
|
Scheduled |
|