Inspection Status: Partial Pass

Inspection History: COT - HCBU - Masonry Pregrout 

Date Description Inspector Results Comments
08/19/2026 COT - HCBU - Masonry Pregrout  Partial Pass 8-19-26: reinforcement at elevator hoist way verified per plans- okay to grout 1st. lift at 4' 8".
08/21/2026 COT - HCBU - Masonry Pregrout  Partial Pass 8-21-26: reinforcement at elevator hoist way verified per plans. Okay to grout 2nd lift at 9' 4".
08/24/2026 COT - HCBU - Masonry Pregrout  Partial Pass 8/24/2026 Building #3. 3rd lift at mechanical room/elevator shaft. 9'4-14'. Approved per 3rd party report.
09/01/2026 COT - HCBU - Masonry Pregrout  Not Ready 9/1/26: per contractor we will inspect final lift on 9/2/26.
09/09/2026 COT - HCBU - Masonry Pregrout  Partial Pass 9/9/26: on arrival, I noted that the north cmu wall had already been grouted and the West cmu wall was partially grouted. Contractor advised he needs to pay a same day inspection fee when requesting a specific time slot. Please submit the 3rd party inspection report to the city for the 1st lift.
09/14/2026 COT - HCBU - Masonry Pregrout  Partial Pass 9/14/2026 Partial pass. lift 2A for all of line 1 and part of line A going south approved. Okay to grout all progress areas.
09/16/2026 COT - HCBU - Masonry Pregrout  Partial Pass 9/16/26: partial pass-okay to grout 2nd lift west side of 2B at 9' 8".
09/18/2026 COT - HCBU - Masonry Pregrout  Partial Pass 9/18/2026 Partial pass. CMU rebar inspection at 18'8" level lines 1 and A. Approved. Okay to grout all progress areas.
09/23/2026 COT - HCBU - Masonry Pregrout  Partial Pass 9/23/2026 Partial pass. CMU rebar inspection: 2nd lift at South and east walls. 4' 8" - 9'4" . Okay to grout all progress areas.
10/06/2026 COT - HCBU - Masonry Pregrout  Re-inspection required 10/6/26: arrived on site at approximately 1030 hours and grout for the cmu walls had already been poured. Please upload a copy of the 3rd party report to the city for review & approval.