Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2026 | COT - HCPL - Plumbing Intermediate | Re-inspection required | 1-6-26: support pex lines at upstairs bathroom, add Boca plates at laundry room, missing backing at the ends/sides of shower-see detail 808/AD2. See flange detail on page AD2. Vapor barrier must be repaired/replaced and schedule required framing inspection. |
|
| 02/05/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2-5-26: plumbing intermediate approved. | |
| 02/18/2026 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 12/05/2025 | COT - HCPL - Plumbing Intermediate | Not Ready | 12.4.25 DWV not under test Not ready, inspection stopped. |
|
| 12/12/2025 | COT - HCPL - Plumbing Intermediate | Not Ready | Leak at tub second floor. Garage area. Add proper supports to ABS running horizontally. Secure ABS midway. 12/12/2025 | |
| 12/18/2025 | COT - HCPL - Plumbing Intermediate | Re-inspection required (with fee) | 12-18-25: upstairs shower not under test, add backing at upstairs bathroom secure hot water pex line, secure vertical pex line with a clamp at upstairs tub, firefoam penetration between 1st & 2nd floor at tub, secure pex lines at water heater, missing greywater-see greywater detail on P1. Stopped inspection Additional Items May Be Added. | |
| 12/24/2025 | COT - HCPL - Plumbing Intermediate | Re-inspection required (with fee) | 12-24-25: fire foam penetrations upstairs & from garage to living spaces-see previous notes, hot pex lines not secured, missing blocking at ends of shower-see detail 808/AD2 and flange detail for more, missing greywater-see previous notes. Stopped inspection-not ready. Note: framing inspection has been scheduled. |