Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 02/18/2026 |
COT - LCBU - Framing |
|
Re-inspection required |
2/18/26: per previous inspection noted on 2-5-26 and 1/6/26 (flex duct shall be properly secured throughout), per inspection on 1/6/26 (B-vent shall maintain 1" clearance from combustibles at 2nd story), drain lines running horizontal between floors shall be properly secured every 4', properly secure walls at first floor closet bedroom and 2nd floor master bedroom, all penetrations at vapor barrier shall be sealed (2nd floor, marked with red marker). |
| 02/19/2026 |
COT - LCBU - Framing |
|
Passed |
|