Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2026 | COT - HCBU - Building Final | Re-inspection required | 4-20-26: add R3 insulation to hot water side of water heater, install ADA restroom signs-must contain braille, adjust both doors at restrooms to 5 pounds of pressure, missing subpanel schedule, install knockout on RTU3 disconnect, Note: roof drain covers were approved on the shell finals but are now missing due to theft. We will verify them at the TCO Final. |
|
| 04/23/2026 | COT - HCBU - Building Final | Partial Pass | 4-23-26: pending panel schedule. | |
| 05/05/2026 | COT - HCBU - Building Final | Passed | 5-5-26: building final approved. |