Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2023 | COT - LCPL - Sewer | Partial Pass | 9/21/23: sewer per plan stub extension ok to backfill | |
| 09/22/2023 | COT - LCPL - Sewer | Partial Pass | 9/8/23 Partial for sewer to HCS from building edge, air test, ok to cover 9/21/23: sewer per plan stub extension ok to backfill 9/22/23: sewer connections with stub-outs for clean outs under pressure south west end. |
|
| 10/16/2023 | COT - LCPL - Sewer | Partial Pass | Partial pass. All plumbing underground under test okay to backfill. Shading is required. 4” stubbed out north center of building pending point of connection to the HCS. 10/16/2023 | |
| COT - LCPL - Sewer | Not Ready | 9/8/23 Partial for sewer to HCS from building edge, air test, ok to cover 9/21/23: sewer per plan stub extension ok to backfill 9/22/23: sewer connections with stub-outs for clean outs under pressure south west end. Partial pass. All plumbing underground under test okay to backfill. Shading is required. 4” stubbed out north center of building pending point of connection to the HCS. 10/16/2023 10/18/23: not ready. |
||
| 10/20/2023 | COT - LCPL - Sewer | Passed |