Permit: TC-COM-0423-01135

Parcel: 13213120F


Addresses:

3476 S KINO PW

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Masonry Pregrout 

Date Description Inspector Results Comments
10/03/2023 COT - HCBU - Masonry Pregrout  Partial Pass Stem wall all four sides ok to grout
10/13/2023 COT - HCBU - Masonry Pregrout  Partial Pass 1st lift, South and West walls.
10/18/2023 COT - HCBU - Masonry Pregrout  Partial Pass Stem wall all four sides ok to grout

1st lift, South and West walls.

10/18/23: 2nd lift reinforcement per plan ok to grout and continue south and west walls. from 5’4” to 10’8”.
10/23/2023 COT - HCBU - Masonry Pregrout  Partial Pass 10/23/23 3rd lift ok to place concrete
10/30/2023 COT - HCBU - Masonry Pregrout  Partial Pass 10/30/23 2nd to last lift west and south wall, ok to place grout
11/01/2023 COT - HCBU - Masonry Pregrout  Partial Pass 11/1/23 top out on west and south walls, first lift on north and east walls ok to place grout
11/06/2023 COT - HCBU - Masonry Pregrout  Partial Pass 11/6/23 ok for 2nd lift north and east walls
11/08/2023 COT - HCBU - Masonry Pregrout  Partial Pass 3rd lift. East and North wall. 10’8 - 16’ rebar per plan. Okay to grout. 11/8/2023
11/13/2023 COT - HCBU - Masonry Pregrout  Partial Pass 4th lift. 16’ - 21’4. Rebar per plan okay to grout. North and East walls of building. 11/13/2023
11/14/2023 COT - HCBU - Masonry Pregrout  Passed