Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Progress
Permit Number - TC-COM-0423-01135
Inspection Description - COT - HCPL - Plumbing Progress
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/30/2024 | COT - HCPL - Plumbing Progress | Partial Pass | ||
02/09/2024 | COT - HCPL - Plumbing Progress | Passed | ||
09/09/2023 | COT - HCPL - Plumbing Progress | Partial Pass | 9/8/23 Partial for sewer to HCS from building edge, air test, ok to cover | |
09/18/2023 | COT - HCPL - Plumbing Progress | Partial Pass | 9/8/23 Partial for sewer to HCS from building edge, air test, ok to cover 9/18/23: Domestic water line under pressure ok to backfill |
|
09/22/2023 | COT - HCPL - Plumbing Progress | Partial Pass | 9/8/23 Partial for sewer to HCS from building edge, air test, ok to cover 9/18/23: Domestic water line under pressure ok to backfill 9/22/23: sewer connections with stub-outs for clean outs under pressure. |
|
09/29/2023 | COT - HCPL - Plumbing Progress | Partial Pass | 9/29/24 potable water line north west corner of lot approximately 100' to riser ok to cover | |
10/10/2023 | COT - HCPL - Plumbing Progress | Partial Pass | 9/8/23 Partial for sewer to HCS from building edge, air test, ok to cover 9/18/23: Domestic water line under pressure ok to backfill 9/22/23: sewer connections with stub-outs for clean outs under pressure. 9/29/24 potable water line north west corner of lot approximately 100' to riser ok to cover 10/10/23: 4" main waste line running north to south ok to back fill pending lateral runs. |
|
10/16/2023 | COT - HCPL - Plumbing Progress | Partial Pass | Partial pass. All plumbing underground under test okay to backfill. Shading is required. 4” stubbed out north center of building pending point of connection to the HCS. 10/16/2023 | |
12/12/2023 | COT - HCPL - Plumbing Progress | Partial Pass | 9/8/23 Partial for sewer to HCS from building edge, air test, ok to cover 9/18/23: Domestic water line under pressure ok to backfill 9/22/23: sewer connections with stub-outs for clean outs under pressure. 9/29/24 potable water line north west corner of lot approximately 100' to riser ok to cover 10/10/23: 4" main waste line running north to south ok to back fill pending lateral runs. Partial pass. All plumbing underground under test okay to backfill. Shading is required. 4” stubbed out north center of building pending point of connection to the HCS. 10/16/2023 12/12/23: roof drains on south east corner per plan and under test. Southwest drains possible leak will call for re-inspection. |
|
12/15/2023 | COT - HCPL - Plumbing Progress | Partial Pass | 12/15/23 roof drain secure and leak checked |