Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Permit Number - TC-COM-0423-01046

Inspection Description - BULD - Electrical Clearance

Inspection Status - Partial Pass

Date Description Inspector Results Comments
10/12/2024 BULD - Electrical Clearance Partial Pass Partial pass. 400 amp disconnect on building #3 back to TEP CT CABINET. All wires ran and fully landed. Verbal clearance to TEP DGL. 10/12/2024
11/13/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter building #4