Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 02/13/2026 |
BULD - Electrical Clearance |
|
Passed |
Verbal clearance to TEP RECN. Swap out disconnect like for like. 2/13/2026 |
| 05/07/2025 |
BULD - Electrical Clearance |
|
Not Ready |
5-7-25, not ready. |
| 05/07/2025 |
BULD - Electrical Clearance |
|
Partial Pass |
5-7-25, panel is okay to be energized. Verbal RECN clearance issued to TEP at 11pm. |
| 06/09/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved solar and structure - DGC Clearance to TEP is required for the solar meter |
| 06/10/2025 |
BULD - Electrical Clearance |
|
Passed |
Duplicate - Previously approved 5/9/25 |