Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2026 | COT - HCEL - Electrical FinalĀ | Partial Pass | 7-24-26: partial pass pending liquid nitrogen line installation at Suite 100. Okay to apply for a Level 1 TCO for STE. 100-Expansion Tank Area Only. Please install a sign at door which will be closed off stating " Not an Exit-Active Construction-No Entry Allowed." Note: this was the only section of the construction inspected. |